Here you will find the latest progress reports and images for the construction of Viewpoint in Manchester, UK. Viewpoint, located in Salford, Manchester, provides easy access to the University of Salford and MediaCityUK and is just 15 minutes from Manchester City Centre, giving it one of the most strategic locations available to date. These modern apartments include fully integrated high spec kitchen appliances, en-suite shower room, contemporary furnishing, flat screen smart TV and secure entrance door with fob entry.
The surrounding complex has a range of features including bicycle storage, underground and ground level car-parking and 24 hour reception and security.
These modern self-contained fully furnished apartments come in 1, 2, or 3 bed options and can be fully managed on your behalf, reducing time consuming property management. This investment represents the very rare opportunity to purchase a unit and have your 2 year 7% NET yield paid to you in advance!
Viewpoint | Development Progress 28/11/2016
This update about the development progress of Viewpoint in Manchester is dated from 28/11/2016. We are pleased to announce that the design and build team’s efforts are beginning to take visible effect on the Viewpoint site
Please find our main points from this update below.
Main Points:
- The site manager is running site safety inductions and meeting Urban Vision, Salford Council & the engineer on site to confirm fixing points for the perimeter fencing.
- Footpath closure application was approved which will see the footpath closed until safe to re-open.
- Construction of perimeter fencing has been started, and the first timber hoarding is expected to be complete by next Monday.
Viewpoint | Development Progress 05/12/2016
This update about the development progress of Viewpoint in Manchester is dated from 05/12/2016. The perimeter fencing around the site is progressing, the demolition contractors are working on the Mainline building and the licence asbestos area is now fenced off.
Please find our main points from this update below.
Main Points:
- The demolition & asbestos removal contractors beginning work, demolition has started on the front two buildings, firstly concentrating on stripping the roof tiles and stonework.
- Areas on the site containing dangerous licensed asbestos have been fenced off and are ‘no go’ areas for anyone other than Allpoint Solutions.
- Machinery, skips and site cabin arrived, and the perimeter fencing on the street frontage continued to be erected.
Viewpoint | Development Progress 12/12/2016
This update about the development progress of Viewpoint in Manchester is dated from 12/12/2016. The front boundary hoarding has Prime Noble Properties advertising boards fixed in place, and this fencing is now complete down the side street.
Please find our main points from this update below.
Main Points:
- The majority of the front Mainline building demolished.
- The Asbestos removal contractors are still working inside the rear buildings to strip & safely remove the remaining asbestos.
- PCD Group demolition contractors have the intricate job of sifting through the rubble by hand to sort recyclable materials such as bricks & stone.
Viewpoint | Development Progress 19/12/2016
This update about the development progress of Viewpoint in Manchester is dated from 19/12/2016. Viewpoint site demolition has continued. Workmen are concentrating on pulling the existing derelict buildings inwards, and sifting through the rubble.
Please find our main points from this update below.
Main Points:
- The asbestos removal team are now complete and they have de-mobilised and left the site.
- The external hoarding is now complete and painted.
- Internal hoarding design has now been approved by Network Rail.
Viewpoint | Development Progress 09/01/2017
This update about the development progress of Viewpoint in Manchester is dated from 09/01/2017. PCD are back on site at Viewpoint now demolishing what is left of the original buildings.
Please find our main points from this update below.
Main Points:
- The plan for demolition is to start from the centre outwards – with the boundary walls on the street side to be the last walls standing.
- Crudens have received the go-ahead from Network Rail to demolish the building near the retaining wall.
-
Next week will see Crudens & the Engineer on site carrying out site investigations along side the demolition works.
Viewpoint | Development Progress 16/01/2017
This update about the development progress of Viewpoint in Manchester is dated from 16/01/2017. Demolition is progressing well this week, with a clear change to the skyline.
Please find our main points from this update below.
Main Points:
- Fencing has been erected along Network Rails’ boundary.
- The self-weighted fencing system will avoid passing unnecessary loadings onto Network Rails infrastructure.
- This has to be in erected before the buildings on the railway boundary can be dismantled.
Viewpoint | Development Progress 23/01/2017
This update about the development progress of Viewpoint in Manchester is dated from 23/01/2017. Progress is speeding up this week with two diggers on site, and more man power.
Please find our main points from this update below.
Main Points:
- Structure at the back of the site due for demolition this week.
- Recycling containers have been placed on site to be filled with demolition debris.
- The aim is to remove all piles of debris and begin the demolition of the old concrete floor slabs and foundations.
Viewpoint | Development Progress 30/01/2017
This update about the development progress of Viewpoint in Manchester is dated from 30/01/2017. This week has seen the site exposing the old ground floor slabs, and hidden basements under the original Main Line buildings.
Please find our main points from this update below.
Main Points:
- Brick facades on Ford Lane have been removed.
- A huge amount of waste have been removed from the site for recycling.
- Negotiations between Crudens & Network Rail will continue next week relating to removing the remaining buildings nearest their retaining wall, and the continued demolition of the basements.
Viewpoint | Development Progress 06/02/2017
This update about the development progress of Viewpoint in Manchester is dated from 06/02/2017. The tallest building being dismantled and taken away from the site this week.
Please find our main points from this update below.
Main Points:
- Ground floor slabs have been demolished and the basements is now fully uncovered.
- The trackside wall is due for demolition. This work will require a track closure, scheduled for Sunday 12th February, and will be undertaken with Network Rail’s supervision.
- The remaining building at the back of the site will then be demolished.
Viewpoint | Development Progress 13/02/2017
This update about the development progress of Viewpoint in Manchester is dated from 13/02/2017. The remaining building was demolished this week, along with the leaning wall belonging to Network Rail. The full extent of the site can now be viewed from one side to the other.
Please find our main points from this update below.
Main Points:
- Existing drainage channels and man holes have been retained where necessary.
- Works on the neighbouring footpath on Greenwood Street are now completed.
- Awaiting the CCTV survey of the drains, and the Ground Investigations.
Viewpoint | Development Progress 20/02/2017
This update about the development progress of Viewpoint in Manchester is dated from 20/02/2017. All the ground slabs and basements have been removed.
Please find our main points from this update below.
Main Points:
- The remaining rubble is loaded & crushed off site, and then brought back to site to fill in the basement voids & be stored ready for the piling mat.
- PCD’s work is coming to a close this week; they will be available on site for two days next week when Crudens’ will co-ordinate the beginning of the ground investigations and levelling of the site.
Viewpoint | Development Progress 27/02/2017
This update about the development progress of Viewpoint in Manchester is dated from 27/02/2017. All the ground slabs and basements have been removed.
Please find our main points from this update below.
Main Points:
- The remaining rubble is loaded & crushed off site, and then brought back to site to fill in the basement voids & be stored ready for the piling mat.
- PCD’s work is coming to a close this week; they will be available on site for two days next week when Crudens’ will co-ordinate the beginning of the ground investigations and levelling of the site.
Viewpoint | Development Progress 06/03/2017
This update about the development progress of Viewpoint in Manchester is dated from 06/03/2017. We are pleased to a further update regarding the construction of Viewpoint in Salford. The Enabling Package is now completed – Crudens have done a great job! We will be posting updates on a fortnightly or monthly basis – details to come soon.
Please find our main points from this update below.
Main Points:
- The gates are locked for the next few weeks – with intermittent consultants visiting to confirm information. But don’t worry we are busy behind the scenes getting ready for the next stage.
- Now the Structural Investigations are also complete, the structural steel design work can begin.
- Our next visible step is to start the detailed level excavation – to reduce the ground levels to where they need to be for the design, prepare the piling mat, and immobilise the on-site set up for the main build.
Viewpoint | Development Progress 13/03/2017
This update about the development progress of Viewpoint in Manchester is dated from 13/03/2017. We are pleased to announce that the construction of Viewpoint in Salford is progressing well. Below you can find information from the developer along with images from the site.
Please find our main points from this update below.
Main Points
- The Ground Investigations are progressing this week on the areas originally covered by buildings.
- Areas being investigated have been carefully chosen in relation to the new design.
- The CCTV investigations have begun which sees cameras & rods inserted into the existing network of drains on site to assess whether they can be reused for the new building or whether new drainage will need to be laid. Some drains are so concealed SONAR technology is having to be used.
Viewpoint | Development Progress 10/04/2017
This update about the development progress of Viewpoint in Manchester is dated from 10/04/2017. Site Investigations have been continuing, to firm up the documentation ahead of the main build.
Please find our main points from this update below.
Main Points
- A missing manhole has been uncovered on site, which must have been back-filled by previous owners and never brought up to the correct ground level.
- We can now begin surveying the next part of the drainage pipes.
- Next week, we will see Cruden’s preparing the site ready for the 2nd part of the enabling package.
Viewpoint | Development Progress 24/04/2017
This update about the development progress of Viewpoint in Manchester is dated from 24/04/2017. This week, the final tests for the ground works are being completed.
Please find our main points from this update below.
Main Points
- Next week Crudens begin on site for the 2nd enabling package, consisting on the reduced level dig, site set up, and piling mat.
Viewpoint | Development Progress 01/05/2017
This update about the development progress of Viewpoint in Manchester is dated from 01/05/2017. This week, Crudens have started the Pre-Start Works on the main site.
Please find our main points from this update below.
Main Points
- Temporary services are being connected, along with a temporary cabin whilst the site set up is constructed.
Viewpoint | Development Progress 15/05/2017
This update about the development progress of Viewpoint in Manchester is dated from 15/05/2017. This week, the setting out of the driveway and kerbs has commenced to create an access route onto the site. These can be seen in the photographs and will be the actual position of the kerbs in the final scheme.
Please find our main points from this update below.
Main Points
- The permanent cabins have been delivered, and will be moved into their final position once the footings have been completed.
- They will remain in this position for the duration of the build.
Viewpoint | Development Progress 12/06/2017
This update about the development progress of Viewpoint in Manchester is dated from 12/06/2017. Please find a selection of new images from the Viewpoint construction site in Manchester.
Following a safety briefing with Crudens, the team were quick to start zoning the site and moving earth, the full site set up is complete.
Viewpoint | Development Progress 27/06/2017
This update about the development progress of Viewpoint in Manchester is dated from 27/06/2017. Please find a selection of new images from the Viewpoint construction site in Manchester.
Remediation of the site has entered week 3 and we can clearly see the zoned areas being treated in accordance with the remediation strategy.
Viewpoint | Development Progress 17/07/2017
This update about the development progress of Viewpoint in Manchester is dated from 17/07/2017. Viewpoint hit an important milestone last week – the pile foundations have started – meaning the build has officially begun!
Viewpoint | Development Progress 11/09/2017
This update about the development progress of Viewpoint in Manchester is dated from 11/09/2017. The groundwork’s are now complete, with the 240-plus piles all covered up and preparations are being made for the next stage. New images below show the stage of the Viewpoint construction site.